2018 Construction Projects

  • CSAH 31 - Crack Seal - Approx 11 miles (July)
  • CSAH 15 - Paving repaired area between TH 71 and CR 154 (June)
  • CSAH 36 - Paving repaired area from Warren Trail east 7000'.  (June)
  • CSAH 332 - Full Depth Reclaim, Road Base Stabilization, and Bituminous Paving.  From TH 53 to CSAH 24.  (June)
  • CSAH 332 - Full Depth Reclaim, Road Base Stabilization, and Bituminous Paving.  From CSAH 24 to CSAH 155 intersection. (June-July)
  • Misc. Paving from culvert and slide repair areas - CSAH 4, 8, and 9. (June)
  • UT 196 & 197 - Paving (June)
  • CSAH 43 - Littlefork Municipal - Miscellaneous Mill and Overlay on several blocks (June-July)
  • CSAH 49 - Littlefork Municipal - Miscellaneous Mill and Overlay on several blocks (June-July)
  • CSAH 10 - Bear River Bridge - Deck rehab and guardrail improvements (June-July)
  • Striping - Striping various CSAH and County roads throughout the SW portion of the County.  Project includes center yellow and white edge lines.  (August)

*This list represents the best available information as of the date posted on the website (12/1/17).  The list and dates of County projects programmed for the 2018 construction season are subject to change.  Please contact the County Highway Department at 218-283-1186 or 218-283-1187 for details.

2018 const 12-01-17

2018 Proposed Construction - Map .pdf