2017 Construction Projects

  • CSAH 18 - Bridge Deck Repair.  (Complete)
  • CSAH 8 - Ester Brook Culvert Replacement (July 22 - August 7)
  • CSAH 10 - Crack Seal (Sept)
  • CSAH 29 - Crack Seal (Sept)
  • CSAH 15 - Grading and Dip Repair between TH 71 and CR 154 (July-August)
  • CSAH 36 - Grade Raise and (6) Culvert Replacements.  From Warren Trail east 7000'.  (July-August)
  • CSAH 332 - Full Depth Reclaim, Road Base Stabilization, and Overlay.  From TH 53 to CSAH 24.  (Sept)
  • CSAH 15 - Pave graded area near CR 61 (2000') and (4) repaired dip areas.  (Sept)
  • CSAH 36 - Pave repaired area near Warren Trail (7000').  (Sept)
  • Misc. Paving from culvert and slide repair areas - CSAH 4, 8, and 9. (Sept)
  • UT 196 & 197 - Paving (Sept)